Continuous Planning Cycle (generic process)
Continuous Planning Cycle (generic process) is the generic process card, GP-107, for the planning process in which every horizon of a workforce plan runs as a closed loop and each week's variance is routed to the loop whose delay matches its persistence; the method is on Workforce Planning as a Control System. It is part of Process Standardization and sits under the capacity-planning section of the function catalog in Anatomy of a ROC Standard.
The card does not replace the monthly cycle on GP-102 or the weekly reforecast on GP-103. It connects them, and adds three steps the cascade lacks: routing variance, netting the supply line, and keeping the annual plan as a ledger of assumptions. Its structural ancestors are rolling-horizon planning with frozen zones[1] and the stock-management structure of system dynamics, in which a decision rule that ignores what is already on order oscillates,[2] with the service-industry evidence that a temporary capacity gap left to the fast levers erodes the quality standard permanently.[3]
Process profile
The profile extends the L0 identity fields of Process Decomposition (L0–L3). Local values are held by the deploying function and marked SET LOCALLY.
| Field | Generic value |
|---|---|
| Card | GP-107 · local card id assigned by the standards committee at deployment
|
| Class | both, in the catalog's four-class vocabulary (strategic · real-time · both · supporting): the cycle runs at every horizon from the interval to the year |
| Trigger | the weekly close of actuals opens the routing step; the monthly decision week opens the capacity decision; a band breach in the assumption ledger opens a decision at any time; the annual re-base is a dated event |
| Cadence | weekly for routing and the plan-of-record proposal; monthly for the capacity decision and the envelope reset; quarterly for the structural review; annually for the re-base (SET LOCALLY; a persistence window of four weeks and a frozen zone of a third of the pipeline are the values used in the companion simulation [E]) |
| Scope in | every pool the function plans; the five loops (interval, short-term, capacity, structural, envelope); the supply line; the assumption ledger; the plan of record and its lineage |
| Scope out | the forecasting method (Three-Step Forecast Build); the interval actions themselves (Real-Time Lever Deployment (generic process)); the hiring process after a requisition is raised; contract negotiation with a partner |
| Inputs | actuals by interval and the forecast with a version on every vintage (Forecast Vintages); the roster and the supply-line stock (decisions committed, requisitions open, offers accepted, classes in training, graduates ramping); the hours-band and contract-band limits; the envelope and authority bands; the definitions register |
| Outputs | the routed variance by lever, weekly; the gap net of the supply line by pool; the plan of record proposed with its lineage to the ledger; band-breach events with owner and persistence; the envelope reset proposal; the structural swing by pool, quarterly |
| Upstream | the enterprise demand forecast; finance's envelope; recruiting's pipeline feed; the definitions register (The Definitions Register) |
| Downstream | GP-102 (receives the routed gap net of the supply line); GP-103 (receives the short-term components); scheduling (the hours-band changes); recruiting (requisitions and class starts); vendor governance (the sized band); finance (the envelope proposal) |
| Resources | the single data model and the semantic layer the loops read (The Data Layer Beneath Continuous Planning); a capacity model that computes the gap net of the supply line; the ledger as a data object; the forum calendar. Platforms are named at L3, never here |
| Decision points | the routing assignment (which loop owns each component); the plan-of-record signature; the band-breach question (is the planned value wrong, or the operation?); the structural question at the pipeline length (band or hire?) |
| Authority tier | routing at the planner tier by rule; the plan of record signed at the function head inside the authority band, escalated to the executive sponsor outside it; a ledger re-set by the assumption's owner; the structural decision at the function head with vendor governance |
| Risk and compliance flags | a plan of record proposed on a forecast without versions cannot be audited; a hiring decision that ignores orders already in the pipeline oscillates (the supply-line misperception of The Supply Line in Capacity Planning); an envelope reset is a financial commitment and follows the finance loop's governance; a frozen zone broken without the change cost recorded is lock erosion |
| Variant-prone steps | the persistence window and the frozen zone (cadence-dependent); the envelope reset (finance calendar); the structural review (contract notice periods); the ledger's tolerance bands (plan sensitivity) |
| Automation candidates | five L2 sub-steps (listed below) |
L1 and L2
The L1 flow has six stages, run at different cadences. A deploying function copies the stages into its own L1 and the step table into its L2 through Wiki:Packs/Process Decomposition.
- Observe and version. Close the week's actuals; score every open forecast vintage by horizon; update the ledger's current estimates.
- Decompose and route. Method on Variance Routing by Horizon.
- Net the supply line and propose. Method on The Supply Line in Capacity Planning.
- Decide inside the band. Sign the plan of record inside the authority band or escalate; release into the frozen zone; review requisitions on the same cadence. Method on Planning Nervousness and Frozen Zones.
- Answer the breach. Method on Assumption Ledgers and the Continuous Annual Plan.
- Size the swing and re-base. Quarterly, decide band or hire for the swing that persisted past a pipeline; annually, review the ledger and re-base. Levers on Supply Elasticity Lever Inventory.
The L2 table decomposes each stage into owned, timed sub-steps in the fifteen columns of the convention. The columns the generic page leaves open, marked SET LOCALLY, are the persistence window, the frozen-zone length, the adjustment time, the tolerance band per assumption, the authority band, and the business-day offsets.
Variants
The known variant classes for this process, recorded per Standard and Variant in Process Documentation:
- Statutory. Where a hiring plan or a reduction must be presented to a works council, stage 4 gains a decision step between the proposal and the release; a variant row, owned by the liaison and approved by the function head.
- Contractual. Where a partner's contract fixes capacity in blocks with notice, stage 6's band decision is constrained by the notice period; the constraint is a SET LOCALLY value on the structural step, not a variant row, until a band contract exists.
- Structural. Where no supply-line feed exists, stage 3 nets a hand-built supply line from the recruiting report and the training calendar; a variant row with a review date each cycle until the feed is built.
- Transitional. A function still running the linear cascade adopts stages 1 and 2 first, read-only, and runs stage 3's gap beside the cascade's own gap for at least one quarter before stage 4 replaces the cascade's decision; a variant row until the standards committee dates the switch.
L3 register
A localizing team writes these job aids against the generic L2; names only, the content is the function's.
| Job aid | Anchored to | Form |
|---|---|---|
| The vintage scoring query and the accuracy-by-horizon report | stage 1 | work instruction |
| The decomposition arithmetic and the persistence test, with its worksheet | stage 2 | work instruction |
| The routing rules: which component to which loop, and the ledger breach | stage 2 | playbook |
| The supply-line stock: sources, ramp curve, attrition applied, productive-equivalents | stage 3 | work instruction |
| The plan-of-record proposal pack: lineage, authority band, change cost | stages 3 to 4 | work instruction |
| The frozen-zone and cancellation rule | stage 4 | playbook |
| The breach question and its record | stage 5 | runbook |
| The structural swing calculation and the band-or-hire decision, drawing on Supply Elasticity Lever Inventory | stage 6 | playbook |
| The re-base checklist | stage 6 | work instruction |
| The variance-by-lever report ("which lever carried the variance") | stages 2 and 6 | work instruction |
Automation candidates
Flagged at L2 per the method on Process Decomposition (L0–L3); released per class of action on a published catch rate per Human Gates and Number Grades.
- Vintage scoring and the ledger's current estimates (stage 1): deterministic against the semantic layer; the first candidate because its catch rate is a comparison of numbers.
- The decomposition and persistence test (stage 2): arithmetic; ranked second because the inputs need an overseer's check before the catch rate means anything.
- The routing assignment (stage 2): rule-based; ranked third because the rule itself is reviewed each quarter and a changed rule resets the catch rate.
- The gap net of the supply line and the plan-of-record proposal (stage 3): computed and proposed with lineage; ranked fourth because the supply-line stock is the newest data object and its feed must prove stable first.
- The breach detection and the envelope reset proposal (stages 5 and 6): computed; ranked last because the breach is rare, so a catch rate takes longest to accumulate.
The signature (stage 4) and the breach answer (stage 5) are never candidates: one is a commitment and the other is a judgement about whether the plan or the operation is wrong.
Maturity Model Position
Four scales on this wiki use the word level; the launch page states which is which. On the WFM Labs Maturity Model™ a function running GP-102 and GP-103 on a published calendar is at Level 2; one that runs stages 1 to 3 of this card read-only beside its cascade is entering Level 3; one that signs the plan of record from stage 3's proposal inside authority bands, with a ledger as a data object and a version on every forecast, is at Level 4: Planning in Distributions; one in which the loops learn from the routed variance without a planner in the path, and the owner is asked only at a breach, is at Level 5: Adaptive Orchestration.
See Also
- Process Standardization — the hub and the inventory this card belongs to
- Workforce Planning as a Control System — the method: five loops, five couplings
- Feedback Loops in Workforce Planning — the loop catalogue and the pathology signatures
- The Data Layer Beneath Continuous Planning — what the loops read and why it has to be one model
- Monthly Capacity Planning Cycle (generic process) — the cycle this card feeds
- Weekly Rolling Reforecast (generic process) — the short-term loop
- Process Shells for a Workforce Standard — the shell marks and the catalog row
- Standard and Variant in Process Documentation — how the variants above are recorded
- Wiki:Packs/Process Decomposition — the pack that localizes this card
References
- ↑ Blackburn, J. D., Kropp, D. H., Millen, R. A., "A comparison of strategies to dampen nervousness in MRP systems", Management Science 32(4), 1986, pp. 413–429.
- ↑ Sterman, J. D., Business Dynamics: Systems Thinking and Modeling for a Complex World, McGraw-Hill, 2000, chapter 17.
- ↑ Oliva, R., Sterman, J. D., "Cutting corners and working overtime: quality erosion in the service industry", Management Science 47(7), 2001, pp. 894–914.