Proposing a Business Definition
Proposing a business definition is the step before an entry in The Definitions Register. When a term is disputed, used two ways, or about to land on a scorecard, someone writes a short definition proposal. It states the problem, shows the competing formulas side by side, sets out the options, recommends one, works an example, says what will change in reported numbers, names what the data owners must build, and lists the open questions. The proposal is the "proposal form" that Definitions and Source-of-Truth Change Control (generic process) (GP-606) names as the supporting artifact of its first step. The register records what was agreed; the proposal records why, and which alternatives were rejected.
The pattern is borrowed from fields that settle shared standards in writing before adopting them:
- Internet standards move through numbered, versioned documents that are reviewed in the open before adoption.[1]
- Open-source language communities ask enhancement proposals to state their motivation and specification, and to record the alternatives considered.[2]
- Software architecture uses a lighter form, the decision record: one short document per decision, giving title, context, decision, status and consequences.[3]
- Metadata-registry standards pair each agreed concept with its representation under one identifier.[4]
A workforce definition proposal combines all four: open review, a record of rejected alternatives, the brevity of a decision record, and the registry's one-term-one-identifier rule.
When a proposal is needed
A term needs a proposal rather than a quick register edit when any of these hold:
- One name, several formulas. The same metric name is computed differently by different platforms, teams or vendors.
- Two terms used interchangeably. Occupancy and utilization are the standard case. The register's rule for them is to define both together or not at all.
- A scorecard or contract is about to depend on it. Once a number is in a scorecard or a vendor schedule, changing its definition is a series break with consequences.
- The instrument cannot produce it. If a platform cannot emit the components, the proposal has to say so. A segment that cannot compute a metric is not assessable on it, which is a different finding from scoring low.
The sections of a proposal
| Section | Holds | Test it must pass |
|---|---|---|
| Problem | The divergence today, with each competing formula quoted exactly and its source system named | A reader can see the disagreement is real arithmetic, not wording |
| Scope | Layer (planning, operational, business or contractual), channels, units, exclusions | The term answers one question for one audience |
| Ledger | The buckets every term reads from, usually tiers of the Agent Time Accounting Model | Every term is a named bucket or an adopted definition |
| Proposed definition | A plain sentence, then the formula by channel; unit, grain, aggregation rule, pairing | Two analysts given the same data get the same number |
| Options considered | Each candidate formula, what it measures, and why it is recommended or rejected | The rejected options stay on record |
| Worked example | Graded synthetic numbers for every option, plus the number as reported today | The arithmetic is recomputed independently |
| Reporting impact | Series breaks, segments that become not assessable, pages and reports that change, who is briefed first, the baseline period | Nobody learns about the change from the scorecard |
| Instrument asks | What the data owners must build: state mapping, source of truth, grain, lineage | Each ask has an owner and a reason |
| Open questions | Numbered; each one closed, or parked with an owner and a date | None left unowned at adoption |
| Register entry and sign-off | The ten register fields completed, signatories by seat, plus a target policy note | The entry can be copied into the register |
Target policy is a note carried alongside the entry, not one of the ten fields. It records whether the metric is an input, an output or a key performance indicator, and whether a target may be set. The target value belongs to the capacity cycle; as Capacity Standards Workshop for Time Accounting puts it, no number changes by agreeing a definition. The policy is still worth recording. Occupancy shows why: under queueing theory, the occupancy a pool can sustain at a given service level depends on the pool's size, so a single fixed occupancy target builds a service failure into the plan for some pools and slack into others.[5] A definition that arrives with a target attached also tends to be managed to the number before anyone knows what normal looks like. That is Goodhart's observation, in its best-known restatement: a measure that becomes a target ceases to be a good measure.[6]
Ownership is split the way the register splits it. The operational function owns the definition and its pairing; the analytics function owns the instrument, the source of truth and the lineage. A proposal names both owners from the start, because a definition the instrument cannot compute is not yet a definition.
Worked example: occupancy and utilization
The example is synthetic. Its inputs are graded [E] under Human Gates and Number Grades, and every ratio computed from them is [C] on [E] inputs.
Problem
Discovery in a multi-platform operation typically finds three formulas under the one name occupancy:
- handling time ÷ (staffed time − auxiliary time)
- handling time ÷ (handling time + ready time × mean concurrency)
- handling time ÷ (handling time + available time)
It also finds a utilization formula that counts idle time in its numerator and keeps auxiliary time in its denominator. The two measures can move in opposite directions: when auxiliary time is converted into available time, occupancy falls while that utilization rises. A leader who hears one while thinking of the other then misreads the staffing position.
Published reference pages carry the same spread:
- Agent Utilization vs Occupancy Definitions and Tradeoffs counts handling, idle, scheduled breaks and meetings as utilized time.
- Occupancy and the ledger table on Agent Time Accounting Model use handle time over paid time.
Each form is legitimate. The organization has to choose one and record why.
Scope and proposed definition
| Occupancy | Utilization | |
|---|---|---|
| Layer | Workforce planning and real time | Business and scorecard |
| Question | Of the time an agent is open for customer work, how much is spent handling it? | Of the paid time, how much is deployed to customer work, in any channel? |
| Formula | Live channels: (talk + hold + after-call work) ÷ (talk + hold + after-call work + available) Email: work ÷ (work + idle in queue) Chat: focus time ÷ chat open time, with concurrency reported separately, as Chat Concurrency and Handle Time explains |
Open time (every state in which the agent is available for, or doing, customer work) ÷ paid time |
| Aggregation | Ratio of sums across intervals and agents | Ratio of sums across agents and weeks |
| Pairing | Service level and pool size; actual against planned | Paid-basis shrinkage (the two sum to 100%) and a companion team time percentage |
| Target policy | An output, never a fixed target; see The Occupancy Trap | No target until a clean baseline exists |
Email occupancy sits near or above 95% whenever items are waiting, because working an item counts as occupied. It is therefore treated as a planning parameter, an assumption checked against measured idle time, rather than as a performance measure.
Options considered (utilization)
| Option | Formula | What it measures | Decision |
|---|---|---|---|
| A | Open ÷ paid | Paid time deployed to customer work | Recommended. Closes to 100% with paid-basis Shrinkage, and is unaffected by mis-coding between channels |
| B | (Open + paid breaks + training + coaching + meetings) ÷ paid | Planned non-customer time counted as utilized, the form on the tradeoffs page | Rejected. Breaks and development disappear into a busy number. Readiness is left out, as on that page |
| C | In-work ÷ paid | Handle density | Rejected as the headline, because it equals A × blended occupancy and inherits channel-mix effects. Kept as a diagnostic |
Training, coaching, meetings and readiness time are published as the companion team time percentage, so time spent developing people stays visible. The denominator is paid time, because it ties to cost and full-time equivalents. A scheduled-time view is published alongside it to show seasonality, because leave is seasonal and a paid-time denominator dips with it.
Worked example
One agent, one week: 40.0 paid hours [E].
- 3.0 hours are off schedule.
- 7.5 hours are in schedule but not open: paid breaks 2.5, training 1.5, coaching 1.0, meetings 1.0, readiness 0.75, unplanned auxiliary time 0.75.
- That leaves 29.5 open hours:
- voice: talk and hold 13.5, after-call work 2.5, available 4.0
- email: work 9.0, idle in queue 0.5
| Measure | Calculation | Result [C] |
|---|---|---|
| Voice occupancy | 16.0 ÷ 20.0 | 80.0% |
| Email occupancy | 9.0 ÷ 9.5 | 94.7% |
| Blended occupancy (diagnostic) | 25.0 ÷ 29.5 | 84.7% |
| Utilization, option A | 29.5 ÷ 40.0 | 73.75% |
| Paid-basis shrinkage | 10.5 ÷ 40.0 | 26.25% |
| Team time | 4.25 ÷ 40.0 | 10.6% |
| Option B | 35.5 ÷ 40.0 | 88.75% |
| Option C, handle density | 25.0 ÷ 40.0 | 62.5% (= 73.75% × 84.7%) |
As reported today. Suppose 3 of the 9 email hours were worked while the voice state showed available, the contamination Production Accounting for Blended Agents describes:
- voice occupancy reports 16.0 ÷ 23.0 = 69.6% against a true 80.0%
- email shows 6.0 work and 0.5 idle, so 92.3%
- utilization stays at 73.75%, because the mis-coding moves minutes between channels but never out of open time
The ledger page works a larger version of the same effect. The difference in robustness is the main argument for option A as the business headline.
Reporting impact, asks and open questions
Reporting impact
- Voice occupancy in blended teams will rise once email has its own state code, with no change in workload. Leaders are briefed before the first report, and the series break is marked.
- Adopting option A changes the utilization formula used in the ledger table on Agent Time Accounting Model and the comparison table on Occupancy. Both pages are listed for amendment through GP-606.
- No utilization target is set until eight weeks of clean baseline exist, outside the holiday season.
Instrument asks
| # | Ask | Owner | Reason |
|---|---|---|---|
| 1 | A separate email state, so email work is never logged as voice available | Analytics lead | Removes the contamination above |
| 2 | Blended-cohort rows added to the precedence table on Agent State Taxonomy and Activity Codes, for minutes an agent spends in two channel states at once | Analytics lead with the head of WFM | Each minute counted once, by the table's rule rather than a private one |
Open questions
| # | Question | Status | Owner | Date |
|---|---|---|---|---|
| 1 | Paid or scheduled time as the headline denominator? | Closed: paid, with scheduled published alongside | Head of WFM | 11 November |
| 2 | Can every segment capture email idle-in-queue time? | Parked: proxy accepted by exception until capture is built | Analytics lead | 4 January |
Register entry and sign-off
| Field | Utilization (new entry, UTL-01) |
|---|---|
| ID | UTL-01 |
| Definition | Share of paid time deployed to customer work in any channel: open time ÷ paid time |
| Instrument | State-to-tier map v1 per platform and vendor (system, field and version recorded per row); payroll hours, or billed hours for vendors, as the denominator |
| Resolution | State minutes at interval grain; a team's weekly figure resolves to about half a point [C]; reported weekly as a ratio of sums |
| Pairing | Paid-basis shrinkage; team time; scheduled-basis view |
| Owner | Head of WFM |
| Signatories | Head of WFM, analytics lead; executive sponsor as well, because the denominator moves a scorecard |
| Version and effective date | v1, adopted 11 November, effective 4 January |
| Carry rule | Graded [A] in a new platform, vendor or state set until its state-to-tier map is re-measured; history before v1 is not restated |
| Change history | v0 proposed 20 October; v1 adopted 11 November |
The occupancy entry, OCC-01, is amended in the same proposal, with the per-channel formulas in its Definition field. The target policy notes travel with both entries. Adoption then follows the four steps of the register and GP-606; the proposal is filed with the entries it produced. When a definition is revised later, the next proposal starts from the last one's rejected options rather than reopening them. A Capacity Standards Workshop for Time Accounting is a natural setting for working several proposals at once, with the ledger agreed first.
Maturity Model Position
Four scales on this wiki use the word level; the launch page states which is which. On the WFM Labs Maturity Model™, the need for a proposal usually surfaces at Level 2, when the first scorecard reconciliation fails. Writing proposals against a ledger and a register, with rejected options on record, is Level 3 practice. At Level 4, every scorecard metric traces to an adopted proposal, and an agent asking what a column means can read the reasoning as well as the formula.
See Also
- The Definitions Register — the ten-field entry a proposal completes, and its change control
- Definitions and Source-of-Truth Change Control (generic process) — GP-606, whose first step uses this proposal form
- The Data Definition Card — the full field set an adopted definition carries
- Agent Time Accounting Model — the ledger tiers every numerator and denominator reads from
- Workforce Data Definitions Framework — the hub for ledger, registers, channels and practices
- Agent Utilization vs Occupancy Definitions and Tradeoffs — the two measures and their trade-offs
- Occupancy and The Occupancy Trap — occupancy as a pool-dependent output
- Production Accounting for Blended Agents — the email-in-available contamination
- Human Gates and Number Grades — the grades on the example's numbers
References
- ↑ Bradner, S. (October 1996). The Internet Standards Process — Revision 3. RFC 2026 / BCP 9. Internet Engineering Task Force. doi:10.17487/RFC2026.
- ↑ Warsaw, B., Hylton, J., Goodger, D., & Coghlan, A. (created 13 June 2000). PEP 1 — PEP Purpose and Guidelines. Python Software Foundation. https://peps.python.org/pep-0001/
- ↑ Nygard, M. (15 November 2011). "Documenting Architecture Decisions". Originally published on the Relevance blog; now hosted by Cognitect. https://www.cognitect.com/blog/2011/11/15/documenting-architecture-decisions
- ↑ International Organization for Standardization / International Electrotechnical Commission (2023). ISO/IEC 11179-1:2023 Information technology — Metadata registries (MDR) — Part 1: Framework.
- ↑ Gans, N., Koole, G., & Mandelbaum, A. (2003). "Telephone Call Centers: Tutorial, Review, and Research Prospects". Manufacturing & Service Operations Management 5(2), 79–141. doi:10.1287/msom.5.2.79.16071.
- ↑ Strathern, M. (1997). "'Improving ratings': audit in the British University system". European Review 5(3), 305–321, at p. 308.